Year: 2008
Client: BOSCH S.A.
The new building was constructed within an existing olive grove.
130 olive trees were removed and stored within the site and
transplanted in the area in order to create the basic green
feature. This allowed the preservation of the memory of the site.
The olives are surrounded with low shrubs and grass that
provides a clean and transparent space in the surroundings of
the industrial building.